Summer into Fall 2009

Studio Progress.

  
   July, construction in recording room.  Working on whisper walls near the double pained window.
   
  July, construction in control room.  Shows protection covering wood flooring while working on ceiling tiles and diffusers.
   
   September, view of classroom area of control room showing Herman Miller desks and seating. 
   
  September, another view of the classroom area looking thru the double pained window into the recording area. 
   
   September, view of the entrance to the recording room with isoroom door open. 
   
   September, recording room with SM7 mic setup. Diffusers are visible on the walls and in the ceiling.