Removed carpet and installed vinyl flooring in the Vice-Chancellor of Academic Affairs' Office.

Floor Layers, November 2008
Removed carpet and installed vinyl flooring in the Vice-Chancellor of Academic Affairs' Office.

Installed drywall (complete) in the Tapers' new training building.

Drywall, November 2008
Installed drywall (complete) in the Tapers' new training building.

Electricians (Local 1186), November 2008
Installed complete wiring for Tapers' new training building.

Drywall, November 2008
Provided materials and installed acoustic ceiling tiles in the Print Shop.

Plumbers (Local 675), November 2008
Tapped into a water source near Building 14 and ran a water line to the Tapers' new training building.

Plumbers (ABC), October 2008
Diagnosed drainage problem in Bldg. 5, Room 103 (Metallurgy Lab).

Carpenters, October 2008
Installed fascia, windows, window frames and siding on Tapers' new training building.

Glaziers, October 2008
Donated and installed jalousies in 15 large windows in the Tapers' new training building.

Roofers, October 2008
Roofed (asphalt shingles) the Tapers' new training building.

Demolished and repoured ramp leading from the parking lot to the security office to eliminate a tripping hazard and to comply with ADA grade guidelines.

Masons, October/November 2008
Demolished and repoured ramp leading from the parking lot to the security office to eliminate a tripping hazard and to comply with ADA grade guidelines.

Masons, October 2008
Filled planters in front of the SMP building with concrete because feral cats were using them as litter boxes and creating a health hazard.

Plumbers (ABC), October 2008
Tapped into water main in the AMT facility and installed cooper piping to supply three new water bibs in front of the building so that staff can plant gardens.

Prepared and painted the first floor exterior of Building 6 and the COSME department first floor hallway.

Painters, October 2008
Prepared and painted the first floor exterior of Building 6 and the COSME department first floor hallway.

Masons, October 2008
Graded, formed and poured a sidewalk in front of Building 14 beneath the decorative sculpture.

Floor Layers, October 2008
Removed carpet and installed vinyl flooring in Building 6, Administration Conference Room.

Installed an underwater scene mural in the Building 5, Courtyard

Masons, October/November 2008
Installed an underwater scene mural in the Building 5, Courtyard.

Masons, October 2008
Prepared and mounted "APPRENTICESHIP" sign and skirt on the outside wall of the Apprenticeship Offices.

Painters, September - October 2008
Began preparing and painting the Maintenance Building, Cosmetology program hallway and the front of Building 6.

Masons, September 2008
Began removing chain link fence on Ewa boundary of the AMT facility and replacing it with a CMU wall.

Masons, September 2008
Demolished and reconstructed damaged CMU column that supports the Building 5 covered walkway (mall entrance to the Courtyard).

Masons, September 2008
Graded and poured driveway for the Carpentry program's outside work area (Bldg. 14).

Masons, September 2008
Graded and poured concrete over an area behind Building 14 that was a tripping hazard and a muddy obstacle when it rained.

Masons, August 2008
Poured stepping stones and placed them between the mall and cafeteria to form a pathway over a grassy area which is always wet.

Carpenters, August 2008
Began forming the floor for the Tapers' new training building in the Carpentry Yard.

Masons, August 2008
Formed and poured concrete to eliminate tripping hazard around electrical manhole between Buildings 2 and 6.

Glaziers, August 2008
Remove and replace shattered pane of glass in the Library rear office.

Plumbers (ABC), August 2008
Investigated and diagnosed plumbing (drainage) problem in Building 12 locker room.

Masons, August 2008
Re-set pole (in concrete) that had been knocked over at entrance to PCATT parking lot. Pole supports the chain that is used to secure the parking lot.

Glaziers and Carpenters, July 2008
Constructed and mounted two mirrors in the COSME esthetician lab.

Masons, August 2008
Cleared incinerator swale to create a walkway between the Chiller area and incinerator lot.

Masons, April 2008
Poured and finished sidewalk leading up to the Oahu Urban Garden gazebo.

Roofers, April 2008
Applied fiberglass shingles to the Oahu Urban Gardan gazebo.

Masons, April 2008
Prepped, formed and poured golf cart path from sidewalk to the Parking Lot 4, concrete pad for the Bldg. 20 dumpster, and entry way to the Apprenticeship Office.

Electricians (Local 368), April 2008
Ran conduit and wires from an electrical panel across the length of the Diesel shop to the new enclosure for the Diesel parts washer.

Painters (ABC), March 2008
Prepped and painted conference rooms and wall in the Library.

Masons, February 2008
Formed and poured curbing foundation for CMU wall and constructed the wall which will enclose the covered outside structure to create a room for the Diesel parts washer.

Glaziers, February 2008
Donated power saw to Maintenance.

Electricians (Local 368), February 2008
Installed 4-plex electrical outlet in the Autobody facility.

Roofers, February 2008
Cleaned and applied non-slip coating to Ewa and Diamond Head entrances to Building 2.

Carpentry, January 2008
Refinished wooden table for State Judiciary.

Masons, January 2008
Built CMU wall to close off one of the entrances to the DIESEL facility.

Electricians (Local 368), January 2008
Installed outlets and flood light in Building 8 - Elevators apprenticeship training space.

Masons, January 2008
Formed and poured slab next to Building 8 to create additional training space for the Elevators apprenticeship classes.

Carpenters, January 2008
Modified door, installed two A/C units and partitioned off a records storage area in Bldg. 8 creating a training space for the Elevators apprenticeship classes.

Floor Layers, January 2008
Re-floored one of the ETC offices at Windward Community College.

Image showing the removal of old carpet and installation of new carpet squares in the Construction Academy Building (old Firehouse).

Floor Layers, November 2007
Removed old carpet and installed new carpet squares in the Construction Academy Building (old Firehouse).

Image showing the completed painting the exterior of Building 3 and began painting exterior of Building 24.

Painters, November 2007
Completed painting the exterior of Building 3 and began painting exterior of Building 24..

Masons, November 2007
Cleared, formed and poured slabs for DISL parts washer and lunch/break areas for AMT and DISL.

Image showing the filled and sealed expansion joint in Building 27 mauka entrance which was hollowed out by a water main rupture.

Masons, October 2007
Filled and sealed expansion joint in Building 27 mauka entrance which was hollowed out by a water main rupture..

Electricians, October 2007
Responded to call from COSM that there was a strong smell of what seemed to be burning electrical wires in their dispensary room. The electricians did a thorough investigation, pinpointed the problem to a malfunctioning old refrigerator and cut the electrical service to this appliance..

Image showing the installed soft tile on ETC (Building 71) classroom floors.

Floor Layers, October 2007
Installed soft tile on ETC (Bldg. 71) classroom floors..

Carpenters, October 2007
Removed and replaced fence railings in the Childcare Center playground and constructed and installed six planters along the Center walkways..

Image showing the removed old tile, extensive preparation of old and damaged wall and replaced ceramic tile in Building 20 Women's Restroom.

Masons, September 2007
Removed old tile, extensive preparation of old and damaged wall and replaced ceramic tile in Building 20 Women’s Restroom..

Image showing the applied non-skid surface material to the Ewa entrance to Building 6 and to the steps leading up to the Building 71 (ETC portables) walkways.

Roofers, September 2007
Applied non-skid surface material to the Ewa entrance to Building 6 and to the steps leading up to the Building 71 (ETC portables) walkways..

Image showing the taped and patched holes in Building 2, Room 416 which be converted into the MELE program studio.

Tapers, September 2007
Taped and patched holes in Building 2, Room 416 which be converted into the MELE program studio..

Image showing the installed industrial grade carpet, padding and cove base molding in Building 2, Room 416 which will be converted into the MELE program studio.

Floor Layers, September 2007
Installed industrial grade carpet, padding and cove base molding in Building 2, Room 416 which will be converted into the MELE program studio..

Image showing the removed and capped plumbing in Building 2, Room 416 which will be converted into the MELE program studio.

Plumbers (Local 675), September 2007
Removed and capped plumbing in Building 2, Room 416 which will be converted into the MELE program studio..

Image showing the repaired electrical outlets in the Carpentry Yard and installed new outlets in the Carpentry Shop.

Electricians (Local 368), September 2007
Repaired electrical outlets in the Carpentry Yard and installed new outlets in the Carpentry Shop..

Image showing the removed and relocated electrical outlets in Building 2, Room 416 which will be converted into the MELE program studio.

Electricians (Local 368), September 2007
Removed and relocated electrical outlets in Building 2, Room 416 which will be converted into the MELE program studio..

Carpenters, September 2007
Demolished counter and sink unit and patched drywall in Building 2, Room 416 which will be converted into the MELE program studio..

Carpenters, September 2007
Repaired the walkway and floor in the trailer located in the back of RAC which serves as the City and County training program classroom. .

Image showing the poured concrete slab in the Diesel Program parking lot to relocate their picnic table. Also, poured another slab to serve as a platform for their new parts washer.

Masons, September 2007
Poured a concrete slab in the Diesel Program parking lot to relocate their picnic table. Also, poured another slab to serve as a platform for their new parts washer..

Image showing the removed, leveled ground and replaced pavers in front of the Student Lounge which were pushed up by tree roots.

Masons, September 2007
Removed, leveled ground and replaced pavers in front of the Student Lounge which were pushed up by tree roots..

Image showing the demolished and re-poured sidewalk that runs from the mall to Building 2 (along the Student Lounge) that had been lifted by tree roots.

Masons, September 2007
Demolished and re-poured sidewalk that runs from the mall to Building 2 (along the Student Lounge) that had been lifted by tree roots..

Carptenters, August 2007
Built a message “sandwich advertising board” for the PRIDE program in Building 5 courtyard..

Masons, August 2007
Added four courses of tile block to the top of the existing wall that borders the mauka end of Parking Lot 3..

Image showing the removal and replacement of ceramic tile on walls and floor in special needs restroom in Building 20.

Masons, May 2007
Removed and replaced ceramic tile on walls and floor in special needs restroom in Building 20.

Image showing painters painting the exterior of Building 3..

Painters, March - May 2007
Continued painting the exterior of Building 3.

Image showing two electrical outlets in the Masons training area behind Building 12.

Plumbers and Fitters, April 2007
Replaced compressor in air conditioning unit which services Building 4, Room 23B.

Image showing two electrical outlets in the Masons training area behind Building 12.

Masons, April 2007
Removed and replaced ceramic tile on the walls and floor in the men's restroom in Building 20.

Image showing two electrical outlets in the Masons training area behind Building 12.

Plumbers and Fitters, March 2007
Ran piping for compressed air from compressor to new plasma cutter in the Sheet Metal shop.

Image showing two electrical outlets in the Masons training area behind Building 12.

Electricians (Local 368), March 2007
Installed two electrical outlets in the Masons training area behind Building 12.

Image showing reinforced and installed new floor on mezzanine in Maintenance Building.

Carpenters and Construction Academy, March 2007
Reinforced and installed new floor on mezzanine in Maintenance Building.

Image showing electrical outlet in HCC Apprenticeship Office.

Electricians (Local 368), March 2007
Installed electrical outlet in HCC Apprenticeship Office.

Image showing installed molding in HCC Childcare Center to secure vinyl floor covering.

Construction Academy, March 2007
Installed molding in HCC Childcare Center to secure vinyl floor covering.

Image showing removed and replaced broken floor ceramic tile and extended and tiled platform for steamers in the cafeteria.

Masons, February 2007
Removed and replaced broken floor ceramic tile and extended and tiled platform for steamers in the cafeteria.

Image showing additional light switch in Autobody classroom.

Electricians (ABC), February 2007
Installed additional light switch in Autobody classroom.

Image showing repaired (re-welded) broken stainless steel counter rack in the cafeteria.

Ironworkers (Jeff Lane), January 2007
Repaired (re-welded) broken stainless steel counter rack in the cafeteria.

Image showing plastered posts and interior of dumpster enclosure between Buildings 2 and 7

Masons, November 2006
Plastered posts and interior of dumpster enclosure between Buildings 2 and 7.

Image showing carpenters removing and replacing trailer walkway ramp and landing

Carpenters, November 2006
Removed and replaced trailer walkway ramp and landing.

Masons, November 2006
Re-tiled ABRP faculty shower.

Plumbers (ABC), November 2006
Replaced plumbing fixtures in ABRP faculty shower.

Plumbers (ABC), November 2006
Modified plumbing to re-position cooking steamers in the cafeteria kitchen.

Masons, November 2006
Repaired crack in sidewalk leading to Building 2 and recaulked the expansion joints in the concrete walkway in front of the Library.

Carpenters, October 2006
Built and installed gate in childcare center walkway.

masons removing and replacing cafeteria tiles

Masons, October 2006
Removed and replaced broken and loose floor ceramic tile in the cafeteria kitchen.

Masons, October 2006
Recaulked the expansion joints in the concrete walkway in the back of the Library.

Masons, October 2006
Patched uneven areas in the sidewalk in front of the Library which were tripping hazards.

Masons, October 2006
Removed portions of concrete in Building 5 courtyard that were pushed up by tree roots creating tripping hazards and from an area which was too steep for wheelchairs. Leveled out these areas with new concrete.

Masons, September 2006
Poured decorative slab for the campus map stand near Building 14.

Carpenters, September - October 2006
Built frames, sized maps and mounted campus maps in Building 7 shelter, on Building 4 wall and near Building 14.

Painters, September - December 2006
Continued painting exterior of Building 3.

Masons, September 2006
Removed and replaced large broken and uneven portions of concrete in the Building 5 Courtyard.

Electricians(Local 368), September 2006
Repaired two broken electrical outlets in the carpenters' concrete form training area in the Kokea Apartments parking lot.

Image showing installed flooring in the mauka half of the Childcare Center.

Floor Layers, August 2006
Installed flooring in the mauka half of the Childcare Center.

Painters, January - May 2006
Painted the front and one side of the ABRP building.

Image showing installed flooring in the makai half of the Childcare Center.

Floor Layers, May 2006
Installed flooring in the makai half of the Childcare Center.

Electricians (Local 368), May 2006
Repositioned all ceiling fluorescent lights in Building 5, Room 202.

Electricians (Local 1186), May 2006
Hard wired ceiling projector in Building 2, Room 616.

Masons, April 2006
Replaced ceramic tiles on benches in front of the cafeteria.

Carpenters, ABRP and SMP, March 2006
Finished and installed campus map stand on Dillingham Blvd.

Masons, February and April 2006
Removed and replaced asphalt sidewalks with concrete sidewalks (mall to childcare center).

Glaziers, February 2006
Provided and cut glass tops for desks in Administration.

Masons, February 2006
Poured a slab of concrete in child care playground.

Masons, February 2006
Poured concrete slab for campus map located on Dillingham Boulevard between ABRP and ETC.

Carpenters, January 2006
Renovated office spaces in Apprenticeship Office.

Glaziers, January 2006
Removed and replaced 16' of full length mirrors in Apprenticeship Conference Room.

Masons, January 2006
Reset sunken pavers around gazebo in front of Building 6.

Masons, January 2006
Erected three tile columns to support sidewalk concrete overhang and demolished old existing tile wall surrounds - Building 20 Ewa entrance.

Masons, January - February 2006
Demolished and rebuilt tile enclosure around the electrical transformer between Buildings 20 and 14.

Masons, January 2006
Laid slate on 9-11 monument and walkway.

Masons, January 2006
Replaced slate on Berlin Wall Monument walkway.